This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

Automatic High-Speed Granule Packing Machine

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SS8-200
Material
Optional
Transport Package
Wooden Pallet
Specification
CE
Trademark
SUNSEE
Origin
Ruian
HS Code
847780000
Production Capacity
1set/Month

Product Description

 

Main Features:
1. With reasonable structure, controlled by PLC, easy operation and maintenance.
2. Machine running is stable and reliable, high yield.
3. Easy to adjust: only about 10 minutes to change different pouches.
4. Main parts of machine come from foreign famous manufacturer. Installs oil-free bear with high precision and wear resistant, no oil pollution.
5. Maximum packing speed is 55 bags/min.
6. Automatic checking: No pouch or pouch open error, no fill, no seal, the bag can be used again, avoid wasting, labor-saving.
Option:
Waterproof Design: the machine surface can be washed down, so easy cleaning, and longer useful life.

Main Technical Parameters:
ModelSS6-200SS8-200SS6-300SS8-300
Pouch TypeFlat bag, 3-side sealing bag, 4-side sealing bag, zipper bag, standup bag etc
Pouch MaterialLaminated film, PP, PE etc
Pouch SizeW:100-210mm
L:100-300mm
W:100-210mm                 L:150-300mmW:150-300mm
L:150-400mm
W:150-300mm
L:150-400mm
Packing weight5-1500g5-1500g5-1500g5-1500g
Packing Speed
(Varies with packing material and filling weight)
20-55 Pouches/min 20-50 Pouches/min20-40 Pouches/Min15-35 Pouches/Min
Air Consumption0.3m3/min0.3m3/min0.3m3/min0.3m3/min
Packing Accuracy≤±1%≤±1%≤±1%≤±1%
Power2.2KW,AC380V,50HZ2.2KW,AC380V,50HZ3KW,AC380V,50Hz;3KW,AC380V,50Hz
Overall Dimensions1530*1350*1450mm1650*1450*1450mm1700*1550*1550mm1950*1640*1780mm
Weight1000kg1200kg1200kg1500kg


After services:
 
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
 
2. How many days will you finish installing?
We will finish installation and training within 15days.
 
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 50USD one day per person.
 
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
 
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
 
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
 
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
 
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
 

Send your message to this supplier

*From:
*To:
avatar Mr. Pero
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
200000 RMB
Plant Area
501~1000 square meters