Zhejiang, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
Year of Establishment:
Management System Certification:
ISO 14064
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Film Slitting Machine, BOPP Slitting Machine, PP Slitting Machine manufacturer / supplier in China, offering Horizontal Type Slitting Machine (CE), 450*2 Double Line plastic Vest Bag Making Machine, Ultrasonic Function Slitting Machine and so on.

Gold Member Since 2017
Audited Supplier

Horizontal Type Slitting Machine (CE)

Get Latest Price
Min. Order / Reference FOB Price
1 SET US $8,000-10,000/ SET
Port: Ningbo, China
Production Capacity: 5set/Month
Payment Terms: L/C, T/T
Application: Commodity
Type: High-Speed Slitting Machine
Work Method: Round Knife Cutting
Structure: Letoff Part
Packaging: Cartons
Classification: Slitting Machine

You Might Also Like


Basic Info

Model NO.: SS-1600
Applicable Process: Final Inspection
Suitable Substrates: Plastic Film
Packaging Material: Wood
Material: BOPP/PP/PE
Speed: 300-350m/Min
Inverter: Yes
Air Shaft: Optional
Trademark: SUNSEE
Transport Package: Wooden Pallet
Specification: CE
Origin: Ruian
HS Code: 847780000

Product Description

This machine is professional to slitting non-woven material and paper .microcomputer control ,EPC control .automatic meter-counter,fix meter automatic stop .
Main parameter:
Max.Width of unwind1600mm 
Max.Unwind diameter 800mm 
Max.Rewind diameter  800mm 
Speed of slitting  25-1600mm
Speed 20-80m/minute 
Total power 2.2kw 
Machine weight1000kg 
Machine dimension2500mm*1800*1200mm 
 After services:
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 50USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.

Send your message to this supplier

avatar Mr. Pero

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed