Zhejiang, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
Year of Establishment:
Management System Certification:
ISO 14064
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Film Blowing Machine, Plastic Film Extruder, PE Film Extruder manufacturer / supplier in China, offering HDPE/LDPE High Speed Film Blowing Machine, 450*2 Double Line plastic Vest Bag Making Machine, Ultrasonic Function Slitting Machine and so on.

Gold Member Since 2017
Audited Supplier
Supplier Homepage Products EXTRUDER HDPE/LDPE High Speed Film Blowing Machine

HDPE/LDPE High Speed Film Blowing Machine

Get Latest Price
Min. Order / Reference FOB Price
1 set US $8,500-12,000/ set
Port: Ningbo, China
Production Capacity: 40-80kg/H
Payment Terms: L/C, T/T, D/P
Type: Extrusion Blow Molding Machine
Raw Material: HDPE
Making Method of Parison: Extrusion-Blow Molding
Automation: Non-Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008

You Might Also Like


Basic Info

Model NO.: J-45
Output: 25-55kg/Hr
Rotary Die Head: Optional
Usage: Roll Bag, Garbage Bag, Shopping Bag
Embossing: Optional
Die Head: 1 Free
Trademark: SUNSEE
Transport Package: Wooden Cases or Wooden Splints
Specification: 4800× 2800× 4300mm
Origin: China
HS Code: 8477900000

Product Description

HDPE/LDPE High Speed Film Blowing Machine

Main Technical Data:
Screw diameter(mm)55mm65mm
Max.Film width(mm)800mm1000-1200mm
Screw L/D length28:128:1
Driving motor(kw)22kw30kw
Thickness of film0.008-0.03mm0.008-0.1mm
Main power36kw42kw
Overall dimension4800×2800×4300mm5000×3000×4800mm

1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 50USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible. 

Send your message to this supplier

avatar Mr. Pero

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed