This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

GB700-2 Two Lines Garbage Bag Rolls-Connecting&Dots-Servering Bag Making Machine

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
GB700
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
Double
Machine Type
Bag Forming Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Auto Roll Change
Yes
Size
Max 350mm
Output
120-150PCS/Min
Material
HDPE LDPE
Transport Package
Wooden Cases or Wooden Splints
Specification
5000*2200*1600mm
Trademark
sunsee
Origin
China
HS Code
847780000
Production Capacity
60m/Min/*2

Product Description

Performance and Characteristics
The machine is adopts corless rewinder. automatic roller changer; synchronous foling&feeding; double roller synchronous feeding not strain. Controlled by Panasonic motor inverter, high-speed& precise, it can produce two lines film at one time. High efficiency and save. the production roll garbage bags without hard (paper) core.
 
Main Technical Parameter
Material  type                     LLDPE.HDPE
Production speed 100-150pcs /*2
60m/min/*2
After fold bag width 100-200mm
Loading film width 200-450mm
Bag length 200-1200mm
Film thickness 0.008-0.025mm
min. 8 to max-25 microns
Total power 6kw
Overall dimension 5000*2200*1600mm
Servo motor 1.0kw
Main part   1.1kw(bag making machine)
Rewinder changer     0.75kw*2
Power supply    380V 50HZ
Other machines we are made
  1. Bag making machine
  1. Zipper bag making machine
  2. Garment bag making machine
  3. Shopping bag making machine
  4. Handle bag making machine
  5. Carry bag making machine
  6. Courier bag making machine
  7. Grape bag making machine
  8. Flower bag making machine
  9. File bag making machine
  10. Opp bag making machine
  11. Bottom sealing machine
  12. Slider bag making machine
  13. Pvc bag making machine
  1. Filling and packing machine
  1. Pillow type packing machine
  2. Four side seal packing machine
  3. Patch packing machine
  4. Dust mask packing machine
  5. Liquid filling and packing machine
  6. Hotel supplies packing machine
  7. Food filling and packing machine


Delivery
•We put your order into our tight production schedule, ensure your punctual delivery time.
•Production / inspection report before your order packed.
•Shipping notice/ insurance to you as soon as your order is shipped.
After sales service
•We respect your feed back after receive the goods.
•We provide 12-24 months warranty after goods arrive.
•We promise all spare parts available in lifetime use.
•We respond your complain within 24hours.

FAQ
 
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 100USD/day.
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.


Q&A:
 
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
 
2. How many days will you finish installing?
We will finish installation and training within 15days.
 
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 50USD one day per person.
 
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
 
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
 
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
 
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
 
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible. 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
200000 RMB
Plant Area
501~1000 square meters